MAPEI Topcem Pronto
最終更新
"Ready-to-use, normal setting, controlled-shrinkage mortar for quick-drying screeds ( 4 days ).For forming unbonded and bonded screeds on new and existing slabs in interiors and exteriors prior to installing wood, PVC, linoleum, ceramic tile, natural stone, carpet or other floor coverings in areas where fast-drying screeds are required in order to lay floorings in a short time.
SKU | 選んでください |
Packing | 選んでください |
Share Product:
詳細
Technical Data
Mixing ratio | 1 25 kg bags of TOPCEM PRONTO with 1.7 litres of water |
Workability time | 40-60 minutes |
Set to light foot traffic | after 12 hours |
Waiting time before laying | 24 hours for ceramic tiles, 2 days for natural stone and 4 days for resilient and wood coverings |
Residual humidity after 4 days | less than 2% |
EMICODE | EC1 R Plus - very low emission |
Storage | 12 months |
Estimated Coverage
Consumption: 18-20 kg/m² per cm of thickness , depending on compaction.
仕様書
ブランド |